kingloverqui
czarodziej/czarownica
Dołączył: 09 Lis 2010
Posty: 485
Przeczytał: 0 tematów
Ostrzeżeń: 0/3 Skąd: England Płeć: Kobieta
|
Wysłany: Czw 19:16, 23 Gru 2010 Temat postu: moncler jackets cheap 2 |
|
Balance method of debugging a new
mg of its material is steel wire, aluminum wire. In particular (1-10) mg ring code is made using very fine aluminum wire, a little carelessness will be deformed. Maintenance personnel in plastic ring code, regardless of the shape of the general, as long as the adjustment of grazing coded hook ring code is not even qualified; this treatment is very poor, but also affect the actual use of the balance. In view of this, the author of TG328 and TG332 type of ring-type code for the diameter measurement (the size range of 20mm and 22ram). Code based on ring diameter size. Developed a special tool plastic ring code (as shown in Figure 2, Figure 3, Figure 4). The ring code shaping tools from a combination of the three components (Figure 5), its easy to operate to good effect. Operation, just in _ distortion meter-2oa7.357 technical articles TECHNOLOGYSECTION use the code sets the adjusting ring in the conical cylinder. Gradually down to the ring-shaped extrusion, and then remove the ring code. Sets of the ring code on the cone base plane. If conditions can be ring code on the plate, with a tapered sleeve surface to flatten the ring code. Cover when not in use can be tapered,[link widoczny dla zalogowanych], conical cylinder,[link widoczny dla zalogowanych], cone sets combined into one base, so that both reduce the volume, and avoid touching the conical cylinder damage. Easier to carry. Code for the ring if there is quality in the loss of plastic, the plastic surgery on several occasions before and after the base circle in Figure 2 Figure 3 sets of tapered conical cylinder in Figure 4 for a cone-shaped sets of //////////,-- ----,- r //----. One. //////////. Figure 5 laps code special tool plastic weighing Combination codes comparison. The results were within the acceptable range. Author ��Wuxi, Jiangsu Province Metrology�� 5E computer sulfur measurement instrument aiming Faulty analysis and change the import Linan Min Xu Huijun Wu Wei in practical work, we usually adopt a 8S 5E computer sulfur measurement instrument for determination of sulfur in coal, this method can quickly and accurately determine the total sulfur content in coal. Here, I used to years of failure and the solution is to make a simple statement. A, 5E computer sulfur measurement instrument structure and characteristics of major computer sulfur measurement instrument 5E mainly by the high temperature cracking furnace, sample institutions, electrolytic cell,[link widoczny dla zalogowanych], and mixers, air purification systems and control systems and other accessories. The sulfur measurement instrument with a high degree of automation, test speed, stable performance, the electrolyte does not return and the stirring speed to avoid regulation and so on. Second,[link widoczny dla zalogowanych], common symptoms, causes and treatment 1. Heating failure (1) temperature, the non-response. Should check the power supply is connected, the fuse is broken (1A, 15A), measuring whether the breaking of silicon-carbon nanotubes. (2) temperature, the heat long bright light (in this case should be immediately cut off the power.) Check the program has a problem, restart the computer; check relay is damaged, the control circuit board is faulty. 582007.3 * mi'l'i (3) temperature, the temperature is displayed as 0 ��, while the actual temperature is increased. Check program is a problem,[link widoczny dla zalogowanych], restart the computer or reinstall the operating software; thermocouple polarity, such as a wrong (which usually appear after the replacement thermocouple), the exchange junction thermocouple polarity: the control circuit board, if any fault , replace the circuit board. . 2. Failure to send samples sent to institutions like bodies from the reversible motor, rack, sample rods and limit switches. Sample delivery and return car-like vehicles are not in place is not in place, check the time settings on whether to send samples; gear slipping, tighten the screw gear; check whether a foreign body causing slide resistance gear too, and add oil; of course, may also is to send sample motor is faulty. 3. Gas purification system for the fault by the electromagnetic air pump, flow meter, dryer, two-way valve and other components, the system pumping speed and air-tightness test results will directly affect the whole. (1) air flow meter is within the liquid, dust contamination, resulting in increased resistance to the float. Lead to instability or inability to regulate traffic. Clean flow of gasoline or alcohol is available. (2) electromagnetic pump cup broken. Resulting flow is low, the extraction of sulfur dioxide gas. Determination results will lead to low electromagnetic pump cup to be replaced. (3) when filled with silica gel dryer, silica gel particles into the gas pipeline within the block; dryer gas block decomposition of sodium hydroxide, or adjust the flow rate less than the required unstable flow. Need to clear the gas. (4) two-way valve filter improper absorbent cotton padding or connection leaks. (5) the system should always check the air tightness, and remove or block gas leakage faults, the aging of the latex tube, silicone tube should be replaced. 4, the electrolytic cell electrolytic cell failure is mainly used for determination of total sulfur in the process of coulometric titration. Made by the plexiglass, cover and seal with a rubber seal between the shell and cover with a pair of platinum indicator electrode (0.5cmxlcm) and a pair of platinum electrodes electrolysis (1cmx1.5cm), each level of each of the electrodes
相关的主题文章:
[link widoczny dla zalogowanych]
[link widoczny dla zalogowanych]
[link widoczny dla zalogowanych]
Post został pochwalony 0 razy
|
|